ZERO BRINE Pilot Plant One Starts in 2019 (NL)
https://www.waterforum.net/bouw-proefinstallatie-zero-brine-project-start-in-januari-in-plant-one/
September 2018, WATERFORUM
Article reports on ZERO BRINE pilot project at the Botlek area of Rotterdam Port, where two pilot installations will be developed, the first of which is scheduled to be built in early 2019.